Projects in industries
(all)
Building
Energy
Industry
Infrastructure
Oil and gas
Transport
Type of solution
(all)
Comprehensive project
Design
Electrical installation and commissioning works
Production
Supply
Clear filters
Customer Sibirtechprom LLC
Task Development and implementation of a technical solution using Schneider Electric equipment for power supply to consumers of the DoubleTree by Hilton Lux hotel complex under construction as part of the DoubleTree by Hilton business center.
Customer AK ALROSA, LLC PTVS
Task Design and construction of a new transformer substation PFS VOS.
Customer "Irkutsk Aviation Plant (IAP), a branch of PJSC Irkut Corporation
Task Development and implementation of a power supply system for the machine park using a complete Canalis Schneider Electric busbar system.
Customer EXC LLC
Task Construction of a modern and mobile degassing unit designed for capturing gas-air mixture from coal mines.
Customer Bratsk Timber Industry Complex
Task Implementation of a new generation of distribution substations with gas-insulated insulation. One of the customer's main requirements is to expand the number of feeders fed due to the increase in production capacity.
Customer Apatit JSC
Task Technical re-equipment of transformer substation-41 with the switching of loads on the responsible consumer in the shortest possible time to ensure non-stop operation of the enterprise. The height of the transformer substation - height 32 m.
Customer Udokan Copper LLC
Task Design of 220/35 kV substation, supply of indoor switchgear 10 kV, 35 kV.
Customer Taishet Anode Factory RUSAL LLC
Task Production and delivery of two new transformer substations.
Customer Tomskneftepererabotka LLC
Task Development of a power supply system for the plant and power supply systems for process equipment using modern control, transmission and data acquisition technologies.
Customer Schneider Electric JSC
Task Development of solutions for the production and supply of digital PTS for the complex of deep processing of hydrocarbon raw materials.
Customer «Rosenergoatom» JSC
Task Implementation of the Power Delivery Scheme for the Akademik Lomonosov FNHPP based on the world's first nuclear-powered floating power unit (FPU) with 62.9 MW KLT-40S reactor units.
Customer Substation "Kazinka" of the Lipetsk Special Economic Zone, Lipetsk
Task Development of detailed documentation for the construction of the substation 220/110/10 kV Kazinka. Correction of design documentation. Providing designer's supervision of the construction.
Customer Baimsky mining and processing plant, Peschanka deposit, Chukotka JSC
Task Construction of 220 kV substation and 110 kV substation on the same site for power supply of Peschanka gold-copper-molybdenum deposit.
Customer MMC «Norilsk Nickel» PJSC
Task Complex reconstruction of main step-down substation-5 and main step-down substation-2 with formation of a new main step-down substation MSDS-52 with voltage of 110 kV.
Customer "Zarubezhneft-Dobycha Kharyaga", Kharyaga Oil Field
Task Development and approval of the power output scheme when Kharyaginskaya TPP-1 (4 Siemens GTUs with a total capacity of 24.3 MW), Kharyaginskaya TPP-2 (2 Solar Turbines Titan GTUs with a total capacity of 26.8 MW) and the external power grid of LUKOIL-EnergoCity LLC are combined for parallel operation.
Customer Ust-Ilimsk Hydroelectric Power Plant, Ust-Ilimsk
Task Design and engineering work to replace circuit breakers at 500 kV outdoor switchgear and related secondary switching equipment - RPA and PA devices to improve the reliability of 500 kV outdoor switchgear of Ust-Ilimskaya HPP and the Siberian UPS as a whole.
Customer Central distribution point of JSC "KOKS", Kemerovo
Task Development and approval of Design documentation for modification of 10 kV switchgear bus scheme of the Central Distribution Point of KOKS PJSC due to construction of turbine generators (TG) -1,2,3 with total capacity of 18 MW.
Customer "Satka Iron-Smelting Works", Satka
Task Development and approval of Design and Detail Documentation for reconstruction of the in-plant electric network 6 kV and external electric network 110 kV in connection with construction of the thermal power plant with capacity of 12 MW.
Customer Substation 220 kV POLIMER "INK", Ust-Kut
Task Fulfillment of the Design and Engineering Program for the external power supply of INK's prospective customers with a maximum capacity of 150 MW in the 1st power supply category - "Irkutsk Polymers Plant" with a total cost of 168 billion rubles.
Customer Arctic СПГ2. RusGasShelf", Gydan Peninsula
Task Development of working documentation for the engineering systems of three buildings: western electrical and instrumentation building, eastern substation, shipping operation room.