Development and implementation of a power supply system for the machine park using a complete Canalis Schneider Electric busbar system.
The company performed a set of works on designing and laying of the bus duct system of 1-5 bays of BAC, as well as modernization of the existing distribution network that supplies power to the plant. As a result of the work performed, the IAZ got a flexible system of electric consumers connection, which allows to quickly configure the location of the machine park according to the needs of modern production.